Precautions For Installation Of Rotary Joint
Nov 06, 2022
1. During the handling and storage of the rotary joint, avoid impact and drop, so as not to damage the interface and internal parts.
2. Install the machine as concentrically as possible to ensure the good operation of the rotary joint.
3. When installing the threaded rotary joint, attention should be paid to whether the thread direction of the inner and outer pipes corresponds to the rotation direction of the drum, and the thread direction of the inner and outer pipes should also be consistent.
4. The connection between the rotary joint and the pipeline must be connected by a hose, and rigid connection is absolutely prohibited.
5. The inlet and outlet of the rotary joint should be directly connected with the hose as much as possible. To reduce the auxiliary weight of the joint and prolong the service life.
6. For the assembly of the inner tube, pay attention to the matching of the size and the auxiliary support of the weight. It is recommended to use the tolerance fit of H8/e7 for the inner tube of the internal rotary joint and the joint.
7. The support and anti-rotation of the rotary joint should be appropriate. Generally, the diameter of the rod should be 2mm smaller than the anti-rotation hole, so as not to affect the free adjustment and compensation of the rotary joint.
Various connection methods for connecting rotary joints and equipment (customers can set various types of connection methods according to the specific structure of the equipment used